A fire broke out in a factory building in Yongkang, Zhejiang Province. The burning substance was plastic.

A fire broke out in a factory building in Yongkang, Zhejiang Province. The burning substance was plastic.

Fire fighting. Zhejiang Yongkang Fire Brigade

  Xinhua News Agency, Jinhua, May 19 (trainee reporter Zhang Tianqi correspondent Li Junying) On the 19th, the reporter learned from Zhejiang Yongkang Fire Brigade that at 08: 36, Yongkang Fire Brigade received an alarm saying that there was a fire in Yuxiang Door Industry, 330 National Road, Huajie, Yongkang City. After receiving the police, the brigade immediately dispatched Yongkang Squadron Class A foam water tanker, heavy-duty water tanker, Isuzu water tanker and high-pressure spray truck with 4 cars and 18 people, and Chengdong Squadron heavy-duty water tanker with 1 car and 7 people, and rushed to the scene to fight the fire.

Fire and smoke. Zhejiang Yongkang Fire Brigade

  At 08: 53, Yongkang Squadron first arrived at the scene, and Chengdong Squadron arrived at 09: 10 to immediately organize the rescue work. At 09: 13, the fire was under control, and at 09: 36, the fire was put out.

Fire. Zhejiang Yongkang Fire Brigade

  According to the preliminary understanding, the factory building with a four-story brick-concrete structure caught fire on the fourth floor, with a single floor area of 1,600 square meters and a total construction area of 4,800 square meters. The fire area was about 50 square meters, and the burning substance was plastic.

Fire fighting. Zhejiang Yongkang Fire Brigade

  At present, the cause of the fire and property losses are under further investigation and verification. (End)

The movie channel will premiere disaster movie’s Breath at 22: 20 on August 23rd.


Special feature of 1905 film network Doomsday arrival, desperate to survive, life begins to count down.

What choice would you make?


todaytwenty past ten p.m.Disaster movie, which premiered, was rated as "realistic as doomsday prophecy!"


"Breathe" poster


A cutting-edge director who won the Canadian Kinney Award for Best New Director, from the foundation of survival — — Air as a breakthrough point, let us face the "suffocation" in an immersive way.

Movies have brought us into a dystopian world.


A strange deadly smog suddenly enveloped Paris and swept the streets.



Serious casualties, streets full of corpses, out-of-control social order, blocked information channels, power and water cuts, lack of food, riots everywhere, and ineffective rescue … …



The deadly smog suddenly paralyzed Paris.


In order to survive, people have to climb to the roof to take refuge.


Unknown smog spreads every day, and human beings are deprived of oxygen and space for survival.


Mathieu (decorated), his wife Anna (played by Olga Corelancome) and his daughter Sarah (played by Findin Harding) are three people trying to survive this disaster.



"We are like fish in an aquarium."


However, this family is not ordinary, and her daughter Sarah suffers from a rare disease — — Gas failure, which forced her to live in a huge, sealed oxygen warehouse.



There is a power outage in the whole city, and my daughter is in danger.


Under the doomsday, Mathieu and his wife Anna must fight for their daughter’s living space in a limited time.

 


The people who play the couple in the film are all representatives of the French acting school.


Romain duris, who plays the role of his father, is the backbone of young and middle-aged actors in the French film industry, and is the favorite of European directors such as Ou Rong and jacques audiard.



He has given wonderful acting skills in Spanish Apartment and other films. He is the winner of the Lumiere Award in the French Golden Globe Award and has been nominated for the Best Actor Award in the French film César Awards for many times.


Stills from Apartments in Spain


The role of mother is played by.



She won the Best Actress at Brooklyn International Film Festival for her first film, and was later known and loved by more audiences for her role as a Chinese girl.


Stills of "007: Breaking the Quantum Crisis"


Under the wonderful interpretation of the two, we seem to have entered this world where we are looking for a chance in desperation.


In order to make the end of Paris to the extreme, let the audience experience the feeling of suffocation, the crew built a one-kilometer-long Paris street in the shed, moved nearly 100 cars and buses into the shed, and restored the scene of the Paris block in a 1:1 real scene.



Not only that, in order to make the presentation effect of smoke more realistic, this small-cost work of 11.27 million euros was cast on the spot when the crew filmed.



The foggy shooting scene of the film has also hindered the actors’ breathing.


The heroine Olga Corelancome said: "Despite wearing a mask, I still feel that I don’t have enough oxygen! I ran and jumped in the play, and the smoke cast on the scene made me choke to eat NG several times. I was afraid that I would suffocate and faint after several shots. "



With the real smoke to render the picture, supplemented by special effects, it makes us feel like we are in a real deadly smoke.


Therefore, we can really feel the suffocating atmosphere every time the protagonists hold their breath.


In addition, different from the usual narrative from all directions and large perspectives, and the bridge of "superhero" saving the earth, this disaster film with French style focuses more on the performance of ordinary people in the face of disasters, and the human nature is moved by the struggle for survival.


Sarah, a little girl in danger, is still thinking about the situation of her little friend who also suffers from rare diseases.



In order to save the dying daughter, parents love their children far more than their own lives, and they risk their lives to enter the deadly fog area, sacrificing themselves for their daughter’s chance of survival.



The disaster intensified, and when the time came, an old couple still loved each other deeply through ups and downs, and finally chose to lie in bed hand in hand and wait for the end of their lives quietly.



Love makes them put down their fears in the face of disaster.


The friendship of mutual help, the affection of living together, and the love of caring for each other all show us a trace of warmth and comfort and great love in the end.


Only love is Noah’s ark in the face of disaster.


At the critical moment of disaster, love is strength and hope!

 


At 22:20 today, the movie channel will premiere the movie Breathe for you. Deadly smog has wiped out the whole city, but even if the future is difficult and dangerous, we are still dependent on each other, because with love, we can March forward.


The modification of CA141 has gone through 6 years! FAW’s second venture is too tortuous.

In 1986, the liberation of CA141 was born, which set off a frenzy in the market and ended the passive situation of the 30-year-old liberation. It took six years for CA141 to be designed and put into production, and its "birth" was very bumpy.

In 1953, Tian Qizhu graduated from Jinan Shandong Institute of Technology, majoring in automobile, and was assigned to with 35 classmates. He started from the design department and was soon transferred to the professional team leader of the transmission group in the assembly laboratory. In 1980, Li Gang, the fourth director of FAW, appointed him as the chief designer of CA141.

The modification of CA141 has gone through 6 years! FAW's second venture is too tortuous.

The transformation of CA141 is hailed as the second venture of FAW, and the transformation cycle is as long as 6 years, including 3 years of finalization and 3 years of production preparation. Tian Qizhu wrote "Ten Suggestions on CA141 Design Scheme" to FAW’s leading group, and it was adopted. Tian Qizhu personally witnessed the 6-year history of CA141 from modification to production, and participated in the whole difficult and tortuous process.

"Jiefang trucks have been changed for a long time. After the introduction and production of the first generation of Jiefang trucks in 1956, the design department began to make new cars under the guidance of Soviet experts. At that time, it was mainly for training. After all, Jiefang trucks had just been put into production and it was impossible to change new cars." Tian Qizhu said that the old liberation car was called CA10, so they made CA11. There are two schemes for CA11: 11A and 11B, and finally 11A is selected.

FAW has also made other models, including the universal car, the internal code CA80, imitation, instead of agricultural tractors, and later only produced a prototype. In addition, the CA150 truck has been built to replace the Jiefang car and adopt a reversible flat-headed cab. After the prototype came out, it was not put into production because the technical strength of trial production was not enough. Then we made CA140. At that time, we carried out four rounds of design work: test, improvement, retest and improvement. FAW was ready to put into production, and spent 1.8 million yuan to purchase automatic equipment and build a cylinder head production line. Later, due to some reasons, it was forced to stop.

The modification of CA141 has gone through 6 years! FAW's second venture is too tortuous.

Jiefang CA140

"There is another reason for stopping CA140. At that time, the state did not require FAW to change its model. Because the second automobile has not yet been put into production, what the country needs most is cars, not new cars. FAW only needs to produce more cars. " As a result, CA140 was used to support the Second Automobile Company, which made some improvements to CA140, which became the famous EQ140.

"FAW wants to change the CA141, and I hope you will be the chief designer." One day in the summer of 1980, the superior leader found Tian Qizhu and arranged it like this. At that time, FAW had no such position as chief designer, and the chief designer was equivalent to the chief designer.

In July, 1980, FAW decided on "the development task of CA141 5-ton truck, the replacement product of Jiefang brand truck". The principles put forward in the design task book are: further tapping potential and improving on the basis of old products; Assemblies and parts shall not be changed or changed as little as possible on the premise of meeting the performance requirements; Fully consider the possibility of transition and the inheritance of existing production technology; Make full use of existing equipment and tooling; Each performance catches up with and exceeds Dongfeng EQ140.

The modification of CA141 has gone through 6 years! FAW's second venture is too tortuous.

In May 1981, all the trial-production drawings of CA141 were issued, and the first prototype car was made in early October, and six prototype cars were made before the end of the year. After the prototype car comes out, it immediately starts comprehensive test work, including 420-hour road simulation strengthening test, bench torsion fatigue test and 10,000-kilometer strengthening road test.

"If the country has test standards, we will implement them according to national standards. If the country has not yet unified norms, we will do it according to our own norms. " Tian Qizhu said that in that era, many things were started from scratch.

The modification of CA141 has gone through 6 years! FAW's second venture is too tortuous.

In the first half of 1982, CA141 completed 28 major tests, including vehicle performance test, 20,000 km reliability test, frame rigidity and stress measurement, leaf spring performance and fatigue life test.

On June 29-30, 1982, FAW conducted the second factory appraisal, and it was decided at the meeting that the assembly and parts tooling that had already started the production preparation design work could be put into production.

On September 23, 1983, the state authorized China Automobile Corporation to hold a national technical review meeting for identification and finalization, and CA141 passed the national appraisal. On October 8 of the same year, China Automobile Corporation officially approved the finalization.

After the CA141 was finalized, a batch of CA141 prototype cars were trial-produced and sent to transportation companies in 6 test sites in China: Wulanhaote, Inner Mongolia, Xiangfan, Hubei, Urumqi, Yunnan Baoshan, Haikou, Hainan, Lanzhou, Gansu, etc. for use test. In addition, an evaluation test was conducted for CA141 for the first time, and more than 400 tests were conducted on two CA141s sent to Hino for evaluation test.

"It was done for nearly 4 months before and after the evaluation test. In some projects, Hino Automobile also compares with us with its own car. Their car is a diesel engine, while ours is a gasoline engine, and the noise is small. Their car is a flat-headed car, ours is a long-headed car, and CA141 looks better. In addition, the performance of CA141 is also good for individual projects such as braking. "

Tian Qizhu said that Hino Auto people also like CA141 very much, and they suggested that the two sides cooperate to install their diesel engines in liberated cars and export them to third countries such as the Philippines. However, because the engine is too expensive, the cost accounts for almost half of the whole vehicle, and the project was not negotiated later.

In January 1987, CA141 was officially put into production, which ended the passive situation of the 30-year-old system of Jiefang Automobile.

The modification of CA141 has gone through 6 years! FAW's second venture is too tortuous.

Because of its good appearance and power, the domestic orders were in short supply, and in 1987, it produced more than 60,000 vehicles. In 1988, it also exported CA141 to North Korea, the United States, Bolivia and Thailand. In the same year, CA141 was also well received at the 21st Cairo International Automobile Expo attended by 28 countries. (The interview materials are from Bunning Studio,)